Bonding, Sealing, Dam & Fill and Glob-Top
Bonding, Sealing, Dam & Fill and Glob-Top The Dam & Fill combination allows for coating a specific area within a set of components.
The PROTAVIC line includes products with high glass transition temperature and low coefficient of thermal expansion.
Dam & Fill protects sensitive components by providing resistance to thermal and environmental stress.
Glob-Top coatings offer the same protections for smaller chips.
Through a diverse product line with a range of chemical and physical properties, PROTAVIC covers all possibilities.
Some examples are listed in the table below.
Technical description
Name
Color
Chemistry
Density
Viscosity at 25°C (cps)
Glass transition temperature (Tg)
CTE (ppm/°C)
Thermal conductivity (W/(m.K))
Volume Resistivity(mΩ.cm)
Work life at 25°C
Cure Condition
Storage life
PROTAVIC® ACE34560HV (X56-10HV)
Silver
Epoxy
2.8
16000 cps
150 °C
50 ppm
-
2.8 mohm.cm
48 hours
60 min at 175°C
12 months at -40°C
PROTAVIC® ANE24054IR
Grey
Epoxy
1.35
16000 cps
51 °C
-
-
-
-
60 min at 120°C
12 months at -40°C
PROTAVIC® ANE44062BH
Black
Epoxy
1.4
13600 cps
168 °C
39 ppm
-
-
48 hours
60 min at 100°C
12 months at -40°C
PROTAVIC® BNE34001 (S-J(M-1))
Black
Epoxy
1.1
7500 cps
111 °C
-
0.24 W/mK
-
72 hours (Before B-stage)
150 min at 85°C (B-stage) / 60 min at 150°C (Final cure)
12 months at -5 ~ -15°C (Before B-stage)
PROTAVIC® ACE34560HV (X56-10HV)
Silver
Epoxy
Chemistry2.8
Density16000 cps
Viscosity at 25°C (cps)150 °C
Glass transition temperature (Tg)50 ppm
CTE (ppm/°C)-
Thermal conductivity (W/(m.K))2.8 mohm.cm
Volume Resistivity(mΩ.cm)48 hours
Work life at 25°C60 min at 175°C
Cure Condition12 months at -40°C
Storage lifePROTAVIC® ANE24054IR
Grey
Epoxy
Chemistry1.35
Density16000 cps
Viscosity at 25°C (cps)51 °C
Glass transition temperature (Tg)-
CTE (ppm/°C)-
Thermal conductivity (W/(m.K))-
Volume Resistivity(mΩ.cm)-
Work life at 25°C60 min at 120°C
Cure Condition12 months at -40°C
Storage lifePROTAVIC® ANE44062BH
Black
Epoxy
Chemistry1.4
Density13600 cps
Viscosity at 25°C (cps)168 °C
Glass transition temperature (Tg)39 ppm
CTE (ppm/°C)-
Thermal conductivity (W/(m.K))-
Volume Resistivity(mΩ.cm)48 hours
Work life at 25°C60 min at 100°C
Cure Condition12 months at -40°C
Storage lifePROTAVIC® BNE34001 (S-J(M-1))
Black
Epoxy
Chemistry1.1
Density7500 cps
Viscosity at 25°C (cps)111 °C
Glass transition temperature (Tg)-
CTE (ppm/°C)0.24 W/mK
Thermal conductivity (W/(m.K))-
Volume Resistivity(mΩ.cm)72 hours (Before B-stage)
Work life at 25°C150 min at 85°C (B-stage) / 60 min at 150°C (Final cure)
Cure Condition12 months at -5 ~ -15°C (Before B-stage)
Storage life